When it comes to bathroom renovations, most homeowners imagine weeks of disruption, dust, and being without one of the most essential rooms in the house. In fact, the Housing Industry Association reports that a complete bathroom renovation can take up to 25 days on average. So how is it that some companies offer to finish in just 6 days? Is it really possible, or just a myth?

The Secret to a 6-Day Renovation: It’s All in the Planning

Achieving a bathroom renovation in just 6 days isn’t magic—it’s all about meticulous planning and efficient processes. At Simple Design & Construction, we use a streamlined system adapted to European construction standards. From day one, everything is mapped out: we work with the client to clearly define their needs, provide 3D blueprints, and carry out precise measurements to ensure no surprises down the line.

We also handle the ordering and transport of all materials, which ensures no time is lost once the work begins. You can see some of our past work in our bathroom renovation portfolio.

How We Do It in 6 Days

  1. Perfect timing and synchronization: The key to success is working in parallel and ensuring the team is perfectly coordinated. Each worker knows exactly what needs to be done and how long they have. Even factors like drying times are calculated based on the season.
  2. Rapid demolition: The project kicks off with demolition, which can be completed in just a few hours using the right tools and efficient planning. This step clears out the old bathroom completely, down to the pepared walls.
  3. Plumbing and electrical rough-in: After the demolition, the plumbing and electrical work are “roughed in,” meaning that the necessary wiring and pipes are set in place for sinks, toilets, lighting, and ventilation.
  4. Tiling and flooring: Once the infrastructure is laid out, we move on to tiling the floors and walls. To speed up the process, we use special quick-drying screeds, which allow us to get tiles down faster without compromising on quality. Learn more about our Express Refurbishment system.
  5. Final touches: During the last two days, we install the bathroom fixtures, including sinks, toilets, mirrors, and any additional furniture or accessories. The space really comes together during this stage.
  6. Professional cleaning: Once everything is installed, the area is professionally cleaned to remove all dust, debris, and waste, leaving you with a spotless, ready-to-use bathroom.

Is It Realistic for Every Bathroom?

It’s important to note that these 6-day renovations are tailored for specific conditions. At Simple Design & Construction, this express service is designed for 5-square-meter bathrooms with no major structural changes, like altering walls or installing underfloor heating. This focused approach allows us to deliver high-quality results within a tight timeframe.

For more details on our design and advice services, visit our planning and design page.

Is It a Myth or Reality?

While most bathroom renovations take at least 12 days, with proper planning and the right team, a 6-day renovation is not only possible—it’s a reality. However, it does depend on the size of the bathroom, the complexity of the work, and having a highly skilled team working in sync.

If you’re looking for a quick and efficient renovation, yes, it can be done! Contact Simple Design & Construction to discuss how we can make your dream bathroom a reality in just 6 days. We collaborate with trusted suppliers such as Leroy Merlin, Almacenes España, Puya, and Porcelanosa, ensuring that all materials are of the highest quality.